Modern living with sustainable fashion

There are eight units total with expected completion by September 2017. All units will be located steps away from the Perry Street light-rail station. The entry to the townhomes will be off of the alley between Perry and Osceola Street. Each unit will have a rooftop deck, which will provide a view to downtown, Dry Gulch Park and mountain views to the west. 

1220 Perry Outside.jpg
Subway tile and two sinks in the master bathroom.

Subway tile and two sinks in the master bathroom.

Second bath features tub with continued subway tile.

Second bath features tub with continued subway tile.

Hardwood floors and an abundant of light shines in throughout every master bedroom.

Hardwood floors and an abundant of light shines in throughout every master bedroom.

The kitchen features high end finishes, quartz countertops and stainless steel appliances.

The kitchen features high end finishes, quartz countertops and stainless steel appliances.

Modern and open living/dining space.

Modern and open living/dining space.

1220-Perry-Outside-Night-2.jpg